JMP Instructions:
P Control Chart


We illustrate using JMP to construct a P chart using the data on Table 3-2, Page 86 of your textbook. This data can be downloaded here:

(Instructions for importing a text file into JMP)

Enter the data into a JMP table as follows:

Select Control Charts from the Graph menu:

Fill the control panel below as follows to get the three-sigma limits control chart on Figure 3-9 of Page 87.

After clicking Chart: